Rear and side extensions
Single and two storey, including full width rear extensions with large structural openings.
Most people come to us with a house that no longer works and a rough idea of what it could be. Our job is to turn that into something buildable, priced properly and finished when we said it would be.
We run the whole build. Foundations, structural steel, roofing, glazing, first and second fix, plastering and decoration are all managed by us, so you deal with one team and one programme rather than chasing six trades yourself.
Single and two storey, including full width rear extensions with large structural openings.
Rear and side returns combined to open up the whole of the ground floor.
New bedrooms and bathrooms built above new ground floor space.
One off houses built from the ground up on private plots.
Steel beams, knock throughs and load bearing alterations, designed and certified.
Drainage, driveways, patios and landscaping, so the property is finished rather than nearly finished.
Compliance
Every structural element is designed by a qualified engineer and inspected by building control at each stage. New builds are registered for structural warranty before we break ground.
We keep the paperwork in order as we go, so at the end of the job your solicitor is not chasing us for certificates.
How it works
We come out, measure up and talk through what you want. If the budget and the brief do not match, we will say so at that point rather than three months in.
Drawings, structural calculations and the planning or building regulations applications. We can do this in house or work alongside your own architect.
A detailed quote broken down by trade and stage, with a start date and a realistic finish date.
Weekly updates, a single point of contact on site, and a proper snagging process before we ask for final payment.
Common questions
Many single storey rear extensions fall under permitted development, but the limits change depending on the property, the site and whether you are in a conservation area. We check this before you spend anything on drawings.
A straightforward single storey rear extension is usually somewhere around twelve to sixteen weeks on site. Two storey work and new builds run longer. You get a programme with your quote.
Usually yes for an extension, because the new structure goes up before we break through. For a full renovation it is often cheaper and quicker to move out for part of it.
Related services
Concept drawings, planning and building regulations packages, structural calculations and steel design.
Find out moreGarage conversions, basements, whole house renovations, joinery and decoration, run as one managed project.
Find out moreMain contractor, design and build and joint venture work for landowners, developers and investors.
Find out moreTell us what you are planning and we will tell you honestly whether we are the right people for it.